Our client had a requirement to urgently house centralised testing operations as well as further stability storage to support their growing vaccines operations in Europe. To gain efficiencies over their current testing procedures and to ensure production capacity was maintained, they required a flexible and rapidly deployed laboratory facility and chose ModuleCo after a competitive tendering and design process.
The XXm2 facility houses laboratory spaces, laboratory support, and stability storage on the ground floor. The second floor houses mechanical and electrical infrastructure spaces, document retention storage rooms, expansion space for further stability chambers and additional write-up space. The second floor is accessed via two stairwells and a personnel lift, all within the modular design produced by ModuleCo. The functional areas are arranged in order to support efficient workflow from sample drop-off through sample storage and testing, while keeping support and administrative functions close by.