ModuleCo have recently installed two operating theatre suites at a Worcestershire NHS Hospital.
Both operating theatres have a footprint of 144m2 and include a UCV laminar flow canopy. Each theatre is supported by an integral scrub, lay up prep rooms, anaesthetic rooms, dirty utilities and IPS.
These are the fifth and sixth of ten operating theatres suites that ModuleCo are installing at hospital sites across the country over six weeks through February and March 2023. Two twin theatre facilities having already been installed at Leicester General Hospital and Guy’s Hospital.